APPLICATION / PRODUCT DEVELOPMENT
“We take complete responsibility for the total solution— from idea to installation.”
The product development and application management process is guided by NMT's design engineering and project management team. The team is responsible for communicating the customers' expectations, ensuring timelines are maintained, design & engineering, production process flow, quality control (finite element analysis), supply chain management, and cost management.
The product development and application management process is guided by NMT's design engineering and project management team. The team is responsible for communicating the customers' expectations, ensuring timelines are maintained, design & engineering, production process flow, quality control (finite element analysis), supply chain management, and cost management.
Analysis
Customer expectations.
Timelines.
Product requirements.
Customer expectations.
Timelines.
Product requirements.
![casestudy1 casestudy1](https://www.nmtsystems.com/wp-content/uploads/2016/12/casestudy1.jpg)
Customer Sample
IDEAS
Drawings.
3-D Models.
Steriolithography
Drawings.
3-D Models.
Steriolithography
![casestudy2 casestudy2](https://www.nmtsystems.com/wp-content/uploads/2016/12/casestudy2.jpg)
Initial design
QUALITY
Finite element analysis. First
article samples.
In-Line inspection
Finite element analysis. First
article samples.
In-Line inspection
![casestudy3 casestudy3](https://www.nmtsystems.com/wp-content/uploads/2016/12/casestudy3.jpg)
Initial Sample
PROCESS
Waste Management. Production
Process Flow.
Logistics.
Waste Management. Production
Process Flow.
Logistics.
![casestudy4 casestudy4](https://www.nmtsystems.com/wp-content/uploads/2016/12/casestudy4.jpg)
Final Product
NMT’s 7 Steps to Product Development
Step 1 Project Management-Time Line Control
Step 2 Design Engineering-Quality & Innovation
Step 3 Finite element analysis-Product Quality
Step 4 Stereolithography-Fit & Form
Step 5 Production Process Flow- Manufacturing Waste Management
Step 6 Supply Chain Management-On Time Delivery
Step 7 Cost Management-Component re-design. Budgets.
NMT’s manufacturing centers are located in Granby (Quebec) Canada, Plattsburgh (New York) United States, and Cixi (Ningbo) China.